Column Sorting with Multi-Sort Support in Blazor Gantt Chart
The Syncfusion® Blazor Gantt Chart component provides sorting functionality to arrange task data in ascending or descending order based on column values.
To enable sorting, set the AllowSorting property to true. Configure sorting options using the GanttSortSettings property.
Sorting is applied by clicking a column header. For multi-column sorting, hold the CTRL key while selecting additional headers. To remove sorting from a specific column in a multi-sorted view, hold the SHIFT key and click the column header.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="700px" AllowSorting="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" ParentID="ParentId">
</GanttTaskFields>
</SfGantt>
@code {
public List<TaskData>? TaskCollection { get; set; }
protected override void OnInitialized()
{
TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string? TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime? EndDate { get; set; }
public string? Duration { get; set; }
public int Progress { get; set; }
public int? ParentId { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>()
{
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2026, 04, 02), EndDate = new DateTime(2026, 04, 06), Progress = 40, ParentId = 1 },
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 30, ParentId = 5 },
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 40, ParentId = 5 },
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 5 }
};
return Tasks;
}
}
- The Blazor Gantt Chart columns are sorted in the ascending order. If you click the already sorted column, the sort direction toggles.
- To disable sorting for a particular column, set the
GanttColumn.AllowSortingproperty to false.
Initial sorting
You can configure sorting during the initial render of the Syncfusion Blazor Gantt Chart by setting the GanttSortSettings property. Within this configuration, define each column in the GanttSortSettings.GanttSortDescriptors collection using the Field and Direction properties to ensure the Blazor Gantt Chart loads with the desired sort order applied to the specified columns.
The following code example shows how to add sorted columns during Gantt initialization, with Field set to TaskID and Direction to Descending, and another with Field as TaskName and Direction as Ascending.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="700px" AllowSorting="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" ParentID="ParentId">
</GanttTaskFields>
<GanttSortSettings>
<GanttSortDescriptors>
<GanttSortDescriptor Field="TaskId" Direction="SortDirection.Descending"></GanttSortDescriptor>
<GanttSortDescriptor Field="TaskName" Direction="SortDirection.Ascending"></GanttSortDescriptor>
</GanttSortDescriptors>
</GanttSortSettings>
</SfGantt>
@code {
public List<TaskData>? TaskCollection { get; set; }
protected override void OnInitialized()
{
TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string? TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime? EndDate { get; set; }
public string? Duration { get; set; }
public int Progress { get; set; }
public int? ParentId { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>()
{
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2026, 04, 02), EndDate = new DateTime(2026, 04, 06), Progress = 40, ParentId = 1 },
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 30, ParentId = 5 },
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 40, ParentId = 5 },
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 5 }
};
return Tasks;
}
}Sort columns externally
You can externally sort columns, clear all sorting in the Syncfusion® Blazor Gantt Chart component using button clicks.
Add sort columns
You can externally sort a column in the Blazor Gantt Chart component using the SortByColumnAsync method with parameters for column name, sort direction, and multi-sort configuration.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Buttons
<SfButton CssClass="e-primary" OnClick="Sorting" style="margin-bottom: 16px;">
Sort Taskname Column
</SfButton>
<SfGantt @ref="Gantt" DataSource="@TaskCollection" Height="450px" Width="700px" AllowSorting="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" ParentID="ParentId">
</GanttTaskFields>
</SfGantt>
@code{
public SfGantt<TaskData>? Gantt;
public List<TaskData> TaskCollection { get; set; }
public void Sorting()
{
Gantt?.SortByColumnAsync("TaskName", Syncfusion.Blazor.Grids.SortDirection.Descending, false);
}
protected override void OnInitialized()
{
TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string? TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime? EndDate { get; set; }
public string ?Duration { get; set; }
public int Progress { get; set; }
public int? ParentId { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>()
{
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2026, 04, 02), EndDate = new DateTime(2026, 04, 06), Progress = 40, ParentId = 1 },
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 30, ParentId = 5 },
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 40, ParentId = 5 },
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 5 }
};
return Tasks;
}
}Clear sorting
You can clear all sorted columns in the Blazor Gantt Chart component using the ClearSortingAsync method to reset the Blazor Gantt Chart to its unsorted state.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Buttons
<SfButton CssClass="e-primary" OnClick="ClearSorting" style="margin-bottom: 16px;">
Clear Sorting
</SfButton>
<SfGantt @ref="Gantt" DataSource="@TaskCollection" Height="450px" Width="700px" AllowSorting="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" ParentID="ParentId">
</GanttTaskFields>
<GanttSortSettings>
<GanttSortDescriptors>
<GanttSortDescriptor Field="TaskId" Direction="Syncfusion.Blazor.Grids.SortDirection.Descending"></GanttSortDescriptor>
<GanttSortDescriptor Field="TaskName" Direction="Syncfusion.Blazor.Grids.SortDirection.Ascending"></GanttSortDescriptor>
</GanttSortDescriptors>
</GanttSortSettings>
</SfGantt>
@code {
public SfGantt<TaskData>? Gantt;
public void ClearSorting()
{
Gantt?.ClearSortingAsync();
}
private List<TaskData>? TaskCollection { get; set; }
protected override void OnInitialized()
{
TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string? TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime? EndDate { get; set; }
public string? Duration { get; set; }
public int Progress { get; set; }
public int? ParentId { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>()
{
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2026, 04, 02), EndDate = new DateTime(2026, 04, 06), Progress = 40, ParentId = 1 },
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 30, ParentId = 5 },
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 40, ParentId = 5 },
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 5 }
};
return Tasks;
}
}Customize the sort action
You can customize sorting behavior using the Sorting and the Sorted events.
The following sample demonstrates how to cancel sorting on the TaskID column using the Sorting event.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<label style="color: red; display: block; margin-bottom: 12px;text-align:center">
@SortMessage
</label>
<SfGantt DataSource="@TaskCollection" Height="450px" Width="700px" AllowSorting="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" ParentID="ParentId">
</GanttTaskFields>
<GanttEvents Sorting="SortingHandler" Sorted="SortedHandler" TValue="TaskData"></GanttEvents>
</SfGantt>
@code {
private string? SortMessage { get; set; }
public List<TaskData>? TaskCollection { get; set; }
public void SortingHandler(SortingEventArgs args)
{
if (args.ColumnName == "TaskID")
{
args.Cancel = true;
SortMessage = $"Sorting on '{args.ColumnName}' is disabled.";
}
}
public void SortedHandler(SortedEventArgs args)
{
SortMessage = $"Sorted by '{args.ColumnName}' in '{args.Direction}' order.";
}
protected override void OnInitialized()
{
TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string? TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime? EndDate { get; set; }
public string? Duration { get; set; }
public int Progress { get; set; }
public int? ParentId { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>()
{
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2026, 04, 02), EndDate = new DateTime(2026, 04, 06), Progress = 40, ParentId = 1 },
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 1 },
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), },
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 30, ParentId = 5 },
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 08), Progress = 40, ParentId = 5 },
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, ParentId = 5 }
};
return Tasks;
}
}Sorting custom columns
You can sort custom columns of different types, such as string or numeric, by adding them to the column collection. Initial sorting can be configured using GanttSortSettings, or the columns can be sorted dynamically through button clicks.
The following sample demonstrates sorting a custom column using an external button click:
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Buttons
<SfButton CssClass="e-primary" OnClick="Sorting" style="margin-bottom: 16px;">
Sort Custom Column
</SfButton>
<SfGantt @ref="Gantt" DataSource="@TaskCollection" Height="450px" Width="700px" AllowSorting="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" ParentID="ParentId"></GanttTaskFields>
<GanttColumns>
<GanttColumn Field="TaskId" Width="100"></GanttColumn>
<GanttColumn Field="TaskName" Width="250"></GanttColumn>
<GanttColumn Field="StartDate"></GanttColumn>
<GanttColumn Field="Duration"></GanttColumn>
<GanttColumn Field="Progress"></GanttColumn>
<GanttColumn Field="CustomColumn"></GanttColumn>
</GanttColumns>
</SfGantt>
@code {
public SfGantt<TaskData>? Gantt;
private List<TaskData>? TaskCollection { get; set; }
public void Sorting()
{
Gantt?.SortByColumnAsync("CustomColumn", Syncfusion.Blazor.Grids.SortDirection.Descending, false);
}
protected override void OnInitialized()
{
TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string? TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime? EndDate { get; set; }
public string? Duration { get; set; }
public int Progress { get; set; }
public int? ParentId { get; set; }
public int CustomColumn { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>()
{
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 09), CustomColumn = 2, },
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, CustomColumn = 3, ParentId = 1 },
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2026, 04, 06), EndDate = new DateTime(2026, 04, 09), Progress = 40, CustomColumn = 4, ParentId = 1 },
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2026, 04, 06), Duration = "0", Progress = 30, CustomColumn = 1, ParentId = 1 },
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2026, 04, 07), EndDate = new DateTime(2026, 04, 09), CustomColumn = 7, },
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2026, 04, 07), EndDate = new DateTime(2026, 04, 09), Progress = 30, CustomColumn = 8, ParentId = 5 },
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2026, 04, 07), EndDate = new DateTime(2026, 04, 09), Progress = 40, CustomColumn = 5, ParentId = 5 },
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2026, 04, 07), Duration = "0", Progress = 30, CustomColumn = 6, ParentId = 5 }
};
return Tasks;
}
}Touch interaction
To perform a tap action on a column header in the Syncfusion® Blazor Gantt component, the Sorting operation is triggered for the selected column. A popup appears when multi-column sorting is enabled. To sort multiple columns, tap the popup and then tap the desired column headers.
The following screenshot shows Gantt touch sorting,